Construction
Construction ERP built for GCC contractors.
Win the tender, control the BOQ, certify every IPC and protect margin to the final account — with procurement, site stores, subcontractors and finance on one data model.
The challenge
The challenges we solve.
Margin erodes quietly
Variations, unbilled work and late cost reports hide losses until the project is nearly finished.
Cash is tied up in certificates
IPCs, retention and advance recovery are worked out in spreadsheets and re-keyed into invoices.
Site and office disagree
Materials, subcontractor claims and drawings live in different systems from the commercial team.
How UPAX helps
Construction ERP capabilities.
A signed Construction industry pack adds sector forms, approval workflows, role mappings and accounts — installed per company in minutes.
Tender to contract
Bid / no-bid gate, priced BOQs and client contracts with variations through a change-order matrix.
Project Control & Cost ManagementInterim payment certificates
Cumulative IPCs with retention, advance recovery, materials on site and VAT, certified and e-invoiced in one flow.
Project Control & Cost ManagementSubcontractor control
Subcontract payment certificates, contra-charges and retention, posted as certified payables.
Project Control & Cost ManagementSite stores and materials
Receive to site, issue to project cost codes and keep stock agreeing with the ledger.
Inventory & WarehouseEarned value and IFRS 15
Monthly cost reports with CPI, SPI and EAC, and revenue over time by cost-to-cost.
Project Control & Cost ManagementDrawings and RFIs
ISO 19650 drawing register, transmittals of current revisions and RFIs that raise variations.
Engineering & Document ControlRecommended modules
The UPAX stack for Construction.
What makes UPAX a construction ERP rather than a general ERP?
UPAX includes construction-specific capability out of the box: priced BOQs, variations, cumulative interim payment certificates, subcontract certificates, two-stage retention release, earned value and IFRS 15 revenue over time. A signed construction industry pack adds forms such as NCRs and site daily reports.
Does UPAX handle retention and advance payment recovery?
Yes. Retention (with caps) and advance recovery are calculated on every IPC and subcontract certificate, and retention is released in two halves at practical completion and after the defects liability period.
Can site teams use UPAX?
Yes. Site engineers raise material issues and measure subcontractor applications, and store keepers receive goods directly to project site stores.
More industries
Explore other sectors.
UPAX for Construction, on your scenarios.
A guided walkthrough built on your own procurement, finance and project scenarios.